Warning: mkdir(): No space left on device in /www/wwwroot/zhenghe19232528.com/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/lhd2615.com/cache/7b/3449a/9c528.html): failed to open stream: No such file or directory in /www/wwwroot/zhenghe19232528.com/func.php on line 115
HENGTONG GROUP CO.,LTD.



    1. 成人APP在线观看,适合半夜看的直播软件APP,看免费电影网站,全部免费的毛片在线看

      News

      News

      Home| News| News

      Hengtong Aberdare ’s high voltage cable of 132 kV expansion project will be officially launched

      2019-7-3 2382 Font size:

      June 26, 2019 - During response to the Matamela Cyril Ramaphosa President’s state of the nation address in Parliament, South Africa’s Department of Trade and Industry, Minister Ibrahim Patel told a story of South Africa's economy industrial development, trade, and investments. During his speech he shared Aberdare Cable Company’s high voltage cable of 132 kV expansion project in Port Elizabeth, which will be officially launched on the 18th July 2018. The Minister will be part of the launch celebrations, and will deliver a keynote speech at the launch event.

      The port Elizabeth factory was established in 1946, which mainly produces low-voltage and medium-voltage power cables. Now the high-voltage product line has been expanded to cover all kinds of common cables, injecting new vitality into Aberdare company and opening a new chapter in the African market.



      网站地图